2016 — 2026

Afsluitdijk

Benthem Crouwel Architects’ minimalistic and uniform design approach brought a 32-kilometers-long civil hydraulic engineering structure back to its monumental essence. Over eight years the dike was reinforced along its entire length and raised by two meters. The dike has also gained additional discharge sluices, new pumping stations, a second storm surge barrier, a fish passage and a new cycle path on the seaward side.

853 Versterken Afsluitdijk N61 websitenew

A DUTCH HYDRAULIC ENGINEERING ICON

Preserving the monumental value of the Afsluitdijk demanded more than engineering alone. Across its full 32 kilometers, the design had to read as a single, consistent structure, governed by one visual language from start to finish. This resulted in a design characterized by spectacular simplicity: abstract in form, minimalist in detail. Technical installations are concealed to minimize distractions, while still allowing people passing by to experience the Afsluidijk’s purpose. What remains visible is the function itself, the enduring image of the Netherlands protected from the water.

853 Versterken Afsluitdijk N60 websitenew

— Photo by Jannes Linders

THE MACHINES VISIBLE

Six mega pumps, part of the pumping station, are one of the few made-visible constructions on the dike. Together they can discharge 275,000 liters of water per second from the IJsselmeer to the sea, fast enough to fill an Olympic swimming pool in just nine seconds. Each pump is protected by a colossal glass dome: 9 meters in diameter, 4 meters high, and weighing 30 tons. In contrast to the complex technologies embedded in the pumping station, the domes are designed in an abstract and simple manner. The transparent domes protect the powerful motors from the elements, waves of the Waddensea and spectacularly showcase the water drainage functionality to passing traffic. Each dome is also designed to be lifted off as a whole, allowing to quickly replace a pump when necessary.

853 Versterken Afsluitdijk N62 websitenew
853 Versterken Afsluitdijk N65 websitenew

— Photos by Jannes Linders

REINFORCED AND RAISED

The primary function of the dike is to protect the land from the sea and to regulate water flow. The discharge complex at Den Oever has therefore been expanded with two new discharge sluices, set between the monumental Stevin Sluices. When the water level in the Wadden Sea is high, sluicing is not possible; for those conditions the pumping station with six pumps was built.

On the Wadden Sea side, the dike has been reinforced with seventy thousand Levvel-blocs of 6,500 kilos each, designed specifically for this project. The shape of the block breaks the waves, is more efficient to lay, contains 25% less concrete and emits 56% less CO₂ than its predecessor. The surface has been left rough so that vegetation can take hold; this is already happening. Its symmetry and regular placement produce a calm image in keeping with the taut, autonomous character of the dike.

853 Versterken Afsluitdijk N68 websitenew

— Photocredit: Levvel

A FIFTEEN-METER OPENING IN THE DIKE

To restore the migration route between the Wadden Sea and the IJsselmeer, a fish migration passage twenty meters wide was designed. For the first time in almost a century, some twelve fish species can expand their habitat. The passage was designed with attention to ecology, form and surroundings. The true scale of the fish migration river can be experienced first-hand; it is open to visitors.

853 Versterken Afsluitdijk N66 websitenew
853 Versterken Afsluitdijk N93 websitenew

EXPERIENCING A FUTURE-PROOF AFSLUITDIJK

The Afsluitdijk is first and foremost a water barrier, but the design also makes the work accessible. A new cycling and walking route crosses directly over the engineering works, where visitors stand on the moving parts themselves; the materials change there and viewing platforms widen into squares. At the Vlieter, halfway along the dike, Benthem Crouwel designed the service area and the footbridge. The solar park at Den Oever, laid out in a fan shape with space between the panels for ground vegetation, supplies power to the installations on the dike, including the pumps.

Client
Rijkswaterstaat
Architect
Benthem Crouwel Architects
Consortium
Levvel: BAM, Van Oord, Rebel and Invesis
Landscape architect
West 8
Location
Kornwerderzand - Den Oever, the Netherlands
Length
32km
Start design
2018
Completed
2026
Photographer
Jannes Linders, Levvel